Latest New School Construction Update

Next week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors inside the building. New School Students will be moving into the building starting August 15th and will continue gradually through the end of August.

The following week (August 19 to August 23), material and equipment deliveries and installation work will continue on all floors.

This weekend the site will be open on Saturday, August 10th for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.

Similar Posts

  • Latest Construction Update: Even More of the Same

    Next week (August 8 to August 12), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work will proceed. The following week (August 15 to August 19 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out,and interior core foundation work & underground plumbing. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, August 6th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.

  • Summertime Movies in Union Square Park

    Enjoy beloved films under the stars at these free outdoor screenings presented by Alamo Drafthouse on four select Thursdays in Union Square Park. Arrive early to enjoy fun pre-show activities starting at 7 p.m., and bring your own blanket to secure a cozy spot before the movies begin at 8 p.m. Limited seating will be available on a first-come, first-served basis.

    2025 Schedule:

    • July 24: The Muppets Take Manhattan

    • July 31: Men in Black

    • August 7: The Taking of Pelham One Two Three

    • August 14: 13 Going on 30

  • The Busway Is Back!!! On August 12!!!

    A state Supreme Court judge has lifted a temporary order blocking the city from rolling out its bedeviled 14th Street busway pilot. Justice Eileen Rakoff ruled that the city’s Department of Transportation (DOT) complied with state law that mandates the agency study the impact of banning private cars on the surrounding residential streets.

    After reviewing documents from the city and the coalition of Manhattan residents petitioning the busway, Rankoff lifted the temporary restraining order that blocked the pilot’s July launch on Tuesday. DOT spokesperson Alana Morales says the agency is beginning work “immediately” and will launch the busway on Monday, August 12.

    Transit advocates who have long called for the pilot program, which was originally timed to launch with work on the L train’s Canarsie Tunnel, praised the ruling as a “huge victory.”

    “When riders organize, the whole city wins,” says Danny Pearlstein with the Riders Alliance. “The 14th Street busway will provide faster and more reliable bus trips, saving precious time for tens of thousands of people who badly need it.”

    Others charge that the ruling sets a key precedent for other streets where residents seek to use the courts to “circumvent the democratic process in order to preserve the car-dominant status quo”— such as Central Park West where members of an Upper West Side condo board are suing to block a bike lane, says Marco Conner, the deputy director of Transportation Alternatives.