    A tempting lineup of sandwiches awaits at the compact new Make Sandwich shop from Spencer Rubin, who owns the Melt Shop chain. He hired Josh Sharkey, the founder of Bark Hot Dogs, as culinary director. The nine preset sandwich combinations, like tri-tip steak with salsa verde, range in price from $7.95 to $11.95. All sandwiches are made to order in five to seven minutes with ingredients like Parmigiano-Reggiano, organic eggs and Pain d’Avignon bread. You can devise your own from a long list of choices for $10.95, with extra charges for some toppings: Make Sandwich, 135 Fourth Avenue (at 14th Street), 212-398-2602, makesandwich.com.

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June.

    Therefore, next week (April 30 to May 4), Superstructure work will continue at the 15th and 16th floor levels. Tuesday, May 1st and Friday, May 4th we will have a pour with a 6 am start time and similar end time, weather permitting. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 7 to May 11), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be closed.

  • Latest New School Construction Update

    Next week (November 19 to November 23), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on the lower floors along 14th st. has been completed and the crane has left the job. The site will be closed on the 22nd for the holiday but will be open Friday the 23rd and Saturday the 24th.

    The following week (November 26 to November 30) Material and equipment deliveries and installation work will continue on all floors.

    This weekend the site will be open on Saturday, November 17th for interior related activities between the work hours of 7AM and 5PM as permitted by the City. Con Ed will be working in the street.