Sign O’ the Times: Union Sq. Copper Thieves

The New York Times has the details on copper thieves who are systematically stripping the facade of the old Zen Palate on Union Sq. West, which has been vacant for over a year. Is this the beginning of the end?

Similar Posts

  • About That Mural

    The Union Square Partnership unveiled a brand-new street mural installation along the pedestrian areas of the 14th Street Busway between Broadway and Union Square West. Titled Collective Vision, the artwork is designed by celebrated street artists GERALUZ and WERC, a Brooklyn-based couple. The mural is presented in partnership with the NYC Department of Transportation’s Art Program, and was installed over a 5 day period last week with the help of community partners and volunteers.

    The design of Collective Vision is inspired by the power of nature and unity as strong extensions of humankind and the Earth. The street mural features the ruby-throated hummingbird to illustrate the power of resilience in standing together against injustice and extinction. Each of the flowers presented in the mural depicts an endangered native plant, from the striped coralroot and swamp sunflower to the sandplain gerardia. These illustrations remind viewers that we all need love and energy to stay alive and flourish, drawing a parallel to the need for solidarity and cooperation amongst humanity, a necessity in order to survive and live harmoniously.

    The mural also pays homage to the history of movements fighting for social justice in Union Square, as well as the struggle for racial equality in America, while celebrating the role public spaces play to unite communities in collective activism and shared experience.

    “Union Square has a proud history as a gathering place for all New Yorkers to come together in collective empowerment to make their voices heard,” said Jennifer Falk, Executive Director of the Union Square Partnership. “We are honored to have the work of artists Geraluz and WERC grace 14th Street in Union Square, promoting the significance of resilience, love and solidarity in this historic location, which has long celebrated community activism and fights against injustice.”

    “We are proud to share the “Collective Vision” mural with the beautiful community of Union Square” share artists GERALUZ + WERC. “Painted in a love language of gratitude in the form of a bouquet of resilience. It’s an honor to create artwork in a place with so much history of unity and power of the people.”

    Geraluz and WERC are Brooklyn-based artists who have worked on many featured murals across New York City. As a team, the couple is passionate about the beautification of public spaces, community empowerment, and art as a healing tool. They often work by taking an analytical and archeological approach to create site-specific pieces that are harmonious with the surrounding area.

    DOT implemented the 14th Street Busway pilot project in October 2019 as an exciting new transit upgrade for 14th Street, and as a street design prototype for the city-at-large. The center of the busway crosses the heart of Union Square, where sidewalk extensions were installed to make additional space for walking. These new pedestrian areas are situated in a highly visible confluence of foot traffic and transit access. Collective Vision is the first artwork to activate the pedestrian areas, presenting a remarkable opportunity to support, enhance, and celebrate the new pedestrian-focused infrastructure while communicating an important message and beautifying the neighborhood.

    “We’re overjoyed to continue pedestrianizing Union Square with the introduction of Collective Vision,” Falk continued. “While the creation of the 14th Street Busway was an incredible first step in rethinking public space prior to the pandemic, the installation of the street mural goes further to highlight the wide, open areas in Union Square created to provide New Yorkers with ample, safe space to walk and enjoy.”

    In early 2021, USP announced the Union Square-14th Street District Vision Plan, aimed to increase public space by 33 percent and make the district more accessible and pedestrian-friendly. USP is a non-profit organization that operates as a public-private partnership, promoting the district’s key advantages and diverse array of assets, as well as advocating for its continued growth and success. For more on the Vision Plan, visit unionsquarenyc.org/vision.

  • Latest New School Construction Update

    Next week (January 21 to January 25), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. Additionally we will begin work on the new sidewalks around the building. The site will be closed for the holiday on Monday, the 21st.

    The following week (January 28 to February 1), Material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work.

    This weekend the site will be open on Saturday, January 19th for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.

  • Holiday Market Is Open

    From The Daily News:

    Skip the holiday gifting anxiety attacks this year and head to the Union Square Holiday Market, now in it’s 13th year. There’s plenty of hand-made jewelry, clothes and other items as well as organic and free-trade finery. Saturday, 10 a.m.-8 p.m. Sunday, 11 a.m.-7 p.m; free admission. Union Square Park, E. 14th St. and Broadway. For more information, go to: www.nycgovparks.org.

  • Latest New School Update

    Next week (November 7 to November 11), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A sidewalk shed will be erected around the perimeter of the site.

    The following week (November 14 to November 18), we will continue superstructure concrete and slabs. Street utility connection work will continue. A street crane will be moved into position on 13th street to place structural steel in the building.

    This weekend the site will be open on Saturday, November 5th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, and rebar for concrete placement and use of the crane and equipment to support all activities.