Next week, 03/04/2013 – 03/08/2013 Material and equipment deliveries and installation work will continue on all floors inside the building. Roof work, work on the new sidewalks around the building, and the dismantling of the construction hoist on the building exterior will also continue.
The following week, 03/11/2013 – 03/15/2013 Material and equipment deliveries and installation work will continue on all floors and roofs. Sidewalk work and dismantling of the construction hoist on the building exterior will also continue.
We anticipate the take down of the 14th Street sidewalk shed to begin within the next 2 weeks.
In case you missed it on Friday, protesters invaded and occupied the New School buidling on our block for about 6 hours on Friday morning. Unlike the previous demonstration in December, this one was summarily shut down by a powerful NYPD push at the request of the university, and around 20 occupiers, some of whom appear to have been troublemakers as opposed to students, were arrested. The real losers in all this were the businesses on our block, who were prevented from opening until Friday afternoon.
Permits have been filed for an 11-story mixed-use building at 31 East 17th Street in Union Square, Manhattan. Located between Broadway and Park Avenue South, the through lot is steps from the 14th Street-Union Square subway hub, serviced by the 4, 5, 6, L, N, Q, R, and W trains. Ken Rosenblum under the Four Roses LLC is listed as the owner behind the applications.
The proposed 168-foot-tall development will yield 39,669 square feet, with 26,023 square feet designated for commercial space and 12,240 square feet for community facility space. The concrete-based structure will also have a cellar.
David Kubik of BKSK Architects is listed as the architect of record. The architectural firm is also responsible for the glass dome addition atop the neighboring 44 Union Square.
This weekend the site will be open on Saturday, July 28st for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend.
Next week (July 30 to August 3), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.
The following week (August 6 to August 10) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors.
Next week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors inside the building. New School Students will be moving into the building starting August 15th and will continue gradually through the end of August.
The following week (August 19 to August 23), material and equipment deliveries and installation work will continue on all floors.
This weekend the site will be open on Saturday, August 10th for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City.
Adding them all up:
–Blue Bottle
–NewsBar
–Joe
–La Maison de Croque Monsieur
–Unnamed Japanese Bakery not yet open
–Blue Stripes Cacao Shop
–Baked by Melissa
–Le Café Coffee
–Nutella Café
–Grey Dog
–Pret a Manger
–Maison Keyser