More Food

The former East West Bookstore on 5th Ave between 13th and `14th will soon open as Human Food, an upscale takeout place with vegan and “paleo” offerings.

Similar Posts

  • Union Square Partnership Gathers Resident Opinions

    How do you feel about Union Square. The Union Square Partnership does an annual opinion survey to find out. Some thoughts from the results:

    FOSTERING A THRIVING ECONOMY IN USQ
    USP asked respondents to share the types of businesses
    they would like to see in Union Square. Half of respondents
    would like to see more cultural institutions (50%),
    followed by art galleries/exhibitions (48%), and cafés/
    coffee shops (47%). Many respondents mentioned wanting
    to see more local businesses — including small, curated
    stores, non-chain coffee shops and eateries, and specialty
    grocery stores. This feedback highlights a strong community
    interest in maintaining a vibrant retail environment in
    Union Square rooted in unique, local offerings.

    ENHANCING LIVABILITY IN USQ
    USP is committed to keeping Union Square clean, safe, and
    beautiful. The majority of respondents are satisfied (very
    satisfied and somewhat satisfied) across key metrics of
    USP’s work enhancing livability. Respondents reported the
    highest levels of satisfaction with the landscaping of Union
    Square Park (87%), planter landscaping (87%), Broadway Plaza
    maintenance (85%), and public seating areas (77%). While
    most respondents remain pleased with the district’s upkeep,
    some expressed a desire for extended hours and seasonality
    for the public seating areas as well as improved lighting,
    especially in Union Square Park and surrounding streets.
    Following USP’s 2023 launch of the Public Safety Officer
    (PSO) program, perceptions of public safety improved by
    15 points in the 2024 survey. The 2025 survey results show
    that this perception has largely stabilized, with 87% of
    respondents noting that their perception of public safety
    in USP’s Core Services Area (CSA) has improved or seen
    no change over the past year. Moreover, the percent of
    respondents reporting concerns around public safety within
    the CSA decreased by 15% in 2025 compared to 2024.

  • The New School Will Have a Sorta Green Roof

    The New School says of its upcoming building:

    “Although gardens are rare in a place as densely built as Manhattan, the designers of the University Center found room for a front lawn of sorts: On the setback between the seventh and eighth floors will sit the Green Roof, carpeted with a leafy green flower called sedum. And in true New School fashion, the Green Roof’s purpose is interdisciplinary, providing both decoration and a boost to sustainability. The sedum plantings help cool and heat the center by providing an extra layer of sustainable insulation. Further, sedum allows the roof to absorb 40 percent of the rain falling on the building, which reduces impact on the city’s water system. The Green Roof, which is just one part of an overall water conservation strategy for the University Center, will reduce the building’s potable water usage by 74 percent and sewer discharge by 89 percent.”

  • The New School Site Used to Be Thomas Edison’s Lab

    Some fun history about 65 5th Ave.

    “The New School has been a presence at 65 Fifth Avenue, the site of the University Center, since 1967, when the university converted a Lane’s department store building for student use. But long before the address became associated with educational innovation, it was renown for innovation of another kind. In 1881, inventor Thomas Edison installed at the address (which was then occupied by a handsome brownstone) a permanent exhibition of his electrical discoveries. The biography Edison: His Life and Inventions reports that “the house was thrown open to the public until late at night, never closing before ten o’clock, so as to give everybody who wished an opportunity to see that great novelty of the time—the incandescent light—whose fame had meanwhile been spreading all over the globe.” It is a fitting legacy for the University Center, which upon opening in Fall 2013 will itself serve as a living teaching tool, with exposed energy and water management systems to provide working demonstrations of sustainable design.”

  • Yet Another Construction Update from the New School

    Next week (August 15 to August 19), contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers, line drilling, lagging and sheeting around the perimeter will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work will proceed. The following week (August 22 to August 26 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out, and interior core foundation work & underground plumbing. DEP will continue to work on the water main along 13th Street. The site will be open on Saturday, August 13th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork and rebar for concrete placement, wood lagging, and installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.