New 14th St. Tech Hub Will Include a Food Hall

 

from 6sqft:

Pioneering food hall operator Urbanspace is opening its latest outpost at Union Square reports the NY Post. They’ve leased 10,000 square feet at Zero Irving, the contested tech hub on 14th Street that will serve as office space, a technology training center and incubator, co-working spaces, and an event space when it opens in the first half of 2021.

Located at 124 East 14th Street, at the former site of the P.C. Richard & Son building, Zero Irving has faced opposition for years, as local preservationists and community groups felt that the rezoning required for the development should have included protections for the surrounding neighborhood, which is largely low-rise and residential.

Nevertheless, the $200 million project has been under construction for the past year. Despite the thousands of small business closings around the city, UrbanSpace founder and president Eldon Scott is confident in what will be his company’s fifth food hall in New York City. “We have the ideal business model to help the New York culinary world recover,” he told the Post.

UrbanSpace’s other locations are Urbanspace Vanderbilt near Grand Central (the first location, which opened in 2015), Lexington Avenue and 51st Street, 135 West 50th Street, and 152 West 52nd Street. They’re also behind the holiday markets in Grand Central, Union Square, Columbus Circle, and Bryant Park, as well as seasonal food market pop-ups like those at Madison Square and the Garment District.

Similar Posts

  • Latest New School Construction Update

    Next week (September 26 to September 30), contractors will continue to excavate earth and rock, loading out material. Line drilling will continue as well in limited areas. Concrete foundation walls at the South East corner of the site and slab on grade work will continue. Interior core foundation work and underground electrical and plumbing will continue. Removal of the interior earth ramp will be completed. DOT approved street connections to underground utilities on Fifth Avenue will progress. The cherry picker crane on site will be removed upon installation of the Superstructure Contractors Crane which will be stationed inside the Fifth Avenue fence.

    The following week (October 3 to October 7 ), we will continue with concrete foundation walls and slabs, line drilling, rock excavation, loading out, interior core foundation work, street utility connections and underground electrical and plumbing. Formwork for superstructure concrete construction will proceed.

    DEP has completed the water main repair along 13th Street. As part of this work the DEP will be completing related road repairs.

    This weekend in addition to the site being open on Saturday, September 24th for foundation related activities between the work hours of 9AM and 5PM as permitted by the City, there will also be a crane installation crew assembling a crawler crane for use by the concrete superstructure contractor.

    Crane installation will involve a partial street closure on Fifth Avenue between E. 14th and E. 13th Streets, as well as a full closure of E. 13th Street between University Place and Fifth Ave. As permitted by the City this activity is to occur between the hours of 6 AM & 9 PM with Sunday, 9/25/11 as a backup date. We don’t plan on needing Sunday for the crane installation unless the weather effects us on Saturday or something else that’s unpredictable prevents the completion of assembly on Saturday. It is anticipated that this work should be completed by end of work day but it could extend until the time allowed.