  • Latest New School Construction Update

    Next week (April 8 to April 12), material and equipment deliveries and installation work will continue on all floors inside the building as well as roof work. We will be work on the new sidewalks around the building as well and plan on completing the 14th street side by the end of the week.

    The following week (April 15 to April 19), material and equipment deliveries and installation work will continue on all floors and roofs as well as sidewalk work. Additionally we plan to begin removing the sidewalk shed along 5th ave.

    This weekend the site will be open on Saturday, April 6th for interior, superstructure, sidewalk, and hoist removal related activities between the work hours of 7AM and 5PM as permitted by the City.

  • 9 East 13th St. in 1939, Part IV

    Thanks to Charles Stimson for purchasing and sharing these four photographs from the city archives. Shot for a tax survey in 1939, they show our block and are full of fascinating detail if you click on them to blow them up and look a little closer. Wouldn’t you love to stop off at Marty’s Luncheon for a sandwich? As New York races into the future, it’s quite a thrill to be able to look back and remind ourselves how things used to be.

  • Irving Plaza Gets A Makeover

    Rock venue Irving Plaza is set to go quiet this summer for an eight-month renovation. The 150-year-old venue hosts its last scheduled show for the year on June 30—headlined by tropical band Guaco—before shutting down for work that is scheduled to last until next spring.

    Live Nation, the concert hall’s operator, announced the planned renovations this week along with the Polish Army Veterans Association, which has owned the building since 1948.

    The 3,300-square-foot hall was converted from a Polish-American community center into a concert venue in 1978. Since then, Irving Plaza’s marquee has listed big-name artists including Bob Dylan, the Foo Fighters, Radiohead and the Talking Heads. Paul McCartney played a surprise show there to a capacity crowd of about 1,000 on Valentine’s Day in 2015.

    But, as some Yelp reviews document, concertgoers have complained about the venue’s narrow interior and a layout that makes it difficult to buy a drink or use the restroom without missing segments of the show.

    Live Nation is promising that the venue will reopen with a revamped lobby, new bars, a downstairs VIP lounge and a remodeled mezzanine with a new configuration for box seats. A Live Nation spokesman said four new bathrooms are on the way as well.

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June. Friday, May 4 we will have a pour at the 16th floor with a 6am start time and similar end dime, weather permitting.

    Therefore, next week (May 7 to May 11), Superstructure work will continue at the 17th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 14 to May 18), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, May 5th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. In addition to the normal work on the job site, we will have an additional crane on site at 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.