Latest New School Update

Next week (October 31 to November 4), Contractors will finish excavating and loading out material. Concrete foundation walls and slab on grade work will conclude as well as underground electrical and plumbing work. DOT approved street connections to underground utilities on Fifth Avenue will progress. Superstructure work will continue at cellar, 1st, and 2nd floor levels.

The following week (November 7 to November 11), we will continue superstructure concrete and slabs. Street utility connection work will continue. A sidewalk shed will be erected around the perimeter of the site, subject to DOB approval, to protect pedestrians from superstructure work.

This weekend the site will be open on Saturday, October 29 for foundation and superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, waterproofing and rebar for concrete placement and use of the crane and equipment to support all activities. We may pour a section of slab on grade concrete on Saturday. There will be no rock excavation or rock chopping.

Similar Posts

  • Water Alert!

    Dear Board Members, Residents, & Building Staff,

    While we are enjoying the nice rain-free weather lately, New York experienced truly little rainfall in October. In fact, it is the second-longest dry spell we have seen in 155 years. This means we are potentially facing water shortages if either the weather does not change and/or we do not cut back on water usage. This past Saturday, Mayor Adams asked city agencies to implement “water savings plans” and suggested that New Yorkers consider cutting back at the tap. While his announcement does not mandate any restrictions on water use, we want to be mindful of the situation. And as we manage hundreds of properties in the five boroughs, we feel it is important to pass along this message. For New Yorkers living in AKAM managed properties interested in doing their part, please consider the following water-saving measures:

    In the Bathroom:

    • Taking shorter showers will save 5 to 7 gallons a minute.
    • When taking a bath, fill the tub only halfway and save 10 to 15 gallons.
    • Install water-saving toilets, showerheads, and faucet aerators.
    • Place a plastic bottle filled with water in your toilet tank if you cannot switch to a low-flow toilet.
    • Turn off the faucet while shaving, washing your hands, or brushing your teeth. Faucets use 2 to 3 gallons a minute.
    • Do not use the toilet as a wastebasket, and do not flush it unnecessarily.

     

    In the Laundry Room/ Kitchen:

    • Run the dishwasher and washing machine only when full. Save even more by using the short cycle.
    • Install faucet aerators.
    • Turn off the water while washing dishes. Kitchen faucets use 2 to 3 gallons a minute. Filling a basin only takes 10 gallons to wash and rinse.

     

    Outside:

    • Use a self-closing nozzle on your hose.
    • Sweep your sidewalk or driveway instead of using water.
    • Water plants before 9am or after 7pm and do not overwater them.

    Other:

    • Repair leaky faucets and turn taps off tightly. A slow drip wastes 15 to 20 gallons each day.
    • Do not open fire hydrants.
    • If you see a leaking or running fire hydrant, please report it to 311 or fill out this online form so we can follow up.
  • Latest New School Construction Update

    This is the 2 week look ahead for the New School’s University Center. Next week (August 5 to August 9), material and equipment deliveries and installation work will continue on all floors inside the building.

    The following week (August 12 to August 16), material and equipment deliveries and installation work will continue on all floors.

    This weekend the site will be open on Saturday, August 3rd for interior, and sidewalk activities between the work hours of 7AM and 5PM as permitted by the City. Additionally we will be paving along 13th st.

    Just a note to those who have made inquiry, the wall board panels are temporary and will be replaced when the final entrances are installed.

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June. Friday, May 4 we will have a pour at the 16th floor with a 6am start time and similar end dime, weather permitting.

    Therefore, next week (May 7 to May 11), Superstructure work will continue at the 17th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 14 to May 18), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, May 5th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. In addition to the normal work on the job site, we will have an additional crane on site at 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.