Next week (June 25 to June 29), Mechanical equipment and work will continue at the 17th and 18th floor levels. The superstructure concrete work will be completed on the building by the end of the month. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

The following week (July 2 to July 6), we will be working on the machine room levels on the 17th and 18th floors. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic. The crane is scheduled for demobilization on Saturday the 7th.

Similar Posts

  • Union Square, 1895

    Here’s a view of Union Square from 1985. The angle is from the southeast looking toward the northwest from the corner of 4th Ave. and 14th. Note that in the good ol’ days, the statue of George Washington was located in the intersection. It was later moved to the southern end of the park. 

  • Darts, Anyone?

    State of Play Hospitality group has signed a lease to open Flight Club, a technology-enabled darts gaming facility, at 31 Union Square West in Flatiron, Manhattan. This will be the group’s first venue in Manhattan, and its ninth lease for the Flight Club brand in North America. The location will be a global flagship for the brand. Flight Club will occupy a 10,700-square-foot space at 31 Union Square West, a 16-story Renaissance Revival building designed by architect Bruce Price. The building was constructed in 1902-03 as the headquarters of the Bank of Metropolis. It was designated a city landmark in 1988 and was added to the National Register of Historic Places in 2003.

    The brand’s new location is scheduled to open in late 2025, joining the building’s history of housing venues like Zippers nightclub in the early 1980s, Metropolis restaurant and club in the late 1980s, and Blue Water Grill from 1996 until recently.

    “We’ve been looking for the right real estate opportunity to land Flight Club in New York for over five years, and this site has the potential to be a genuine landmark for the city and the group,” said Toby Harris, CEO of State of Play Hospitality. “Both 31 Union Square as a building and the stunning split level Flight Club space are as close to the physical brief for the brand that we could wish for. I’m confident that by complementing and retaining the character of the building, we will be able to do it justice.”

    Since launching the first U.S. Flight Club in Chicago in 2018, State of Play has expanded the brand to Boston, Houston, Atlanta, Las Vegas, and Denver, with new venues set to open in Washington D.C. and Philadelphia in late 2024.

  • Lastest New School Construction Update

    Next week (November 14 to November 18), DOT approved street connections to underground utilities on Fifth Avenue and 13th street will continue. Superstructure work will continue at cellar, 1st, and 2nd floor levels. A street crane will be moved into position early on Wednesday the 11/16 on 13th street to place structural steel in the building and should be out by the end of the day, weather pending.

    The following week (November 21 to November 25), we will continue superstructure concrete and slabs. Street utility connection work will continue. Sidewalk sheds will continue being erected around the perimeter of the site. The project will be closed on Thanksgiving Day, 11/24, and open for work on 11/25.

    This weekend the site will be open on Saturday, November 12th for superstructure related activities between the work hours of 9AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork, plumbing and electrical work, rebar for concrete placement and use of the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise.