Bowlmor to Be Replaced by 23-Story Behemoth

Awful news: the building replacing Bowlmor Lanes will be 23 stories high. Here are the terrible details.

Similar Posts

  • The Upcoming 14th St. Busway

    For 17 hours each day during the L train shutdown, Manhattan’s 14th Street will be converted into a “busway” with very limited access to car traffic, reports the NY Daily News.

    According to court documents from the MTA from a lawsuit regarding the shutdown, 14th Street, from Ninth to Third avenues eastbound and from Third to Eighth avenues westbound, will give priority to bus traffic from 5 a.m. to 10 p.m., seven days a week in attempt to mitigate transit woes. Manhattan residents will be granted vehicle access to 14th Street for pickups and drop-offs only.

    Additionally, the Department of Transportation has revised its bike path plan, now calling for two one-way bike baths on 12th and 13th streets instead of a single two-way bike path on 13th Street, notes the Daily News.
    “We’re solving, hopefully, the local mobility and access challenge while discouraging through traffic on 14th Street,” said DOT Commissioner Polly Trottenberg in a statement.

    Last week, City Council speaker Corey Johnson announced plans to propose new legislation that would require the city to open at least two information centers to update riders about the progress of the Canarsie Tunnel repairs, give transportation alternatives, and create an ombudsman job within the Department of Transportation to monitor comments and investigate complaints about transportation projects.

  • Latest New School Construction Update

    Next week (October 29 to November 2), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on the lower floors will proceed along 14th st. inside the construction site. The crane that is on site will remain for the duration of curtain wall installation and will not affect pedestrian or automotive traffic.

    The following week (November 5 to November 9) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on the lower floors will proceed along 14th st. inside the construction site.

    This weekend the site will be open on Saturday, October 27th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. Con Ed will be working in the street.

  • E-Waste Collection January 12

    Bring your electronic junk to the north end of Union Square on January 12 from 10-2. Here are the details:

    We accept the following working and non-working consumer electronic equipment:

    • Computers (laptops & desktops, servers, mainframes)
    • Monitors (CRT and flatscreen)
    • Network devices (routers, hubs, modems, etc.)
    • Peripherals (keyboards, mice, cables, cords, chargers, etc.)
    • Tablets and e-readers
    • Components (hard drives, CD-ROMs, circuit boards, power supplies, etc.)
    • Printers under 100 pounds, scanners, fax machines, etc
    • TVs, VCRs, DVRs, DVD & Blu-ray Players
    • Digital Converter Boxes, Cable/Satellite Receivers
    • Portable music players
    • Audio-visual equipment
    • Video-games
    • Cell phones, pagers, PDAs
    • Telecommunication (phones, answering machines, etc.)

    We no longer accept:

    Batteries (except lead-acid batteries from UPS (uninterrupted power supplies) systems, rechargeable batteries can be dropped off for recycling at any store that sells them, also check out IKEA and Staples stores for battery recycling.

    Media, such as disks, DVDs, VHS tapes, cassette tapes, etc.

    Please visit greendisk.com to purchase a shipping label to get these items recycled