A Proposal for Significant Enhancements Around the Edges of Union Square

The Union Square Partnership has proposed a wide-ranging collection of enhancement to remake Union Square Park, expanding its edges into the surrounding streets to make it a much bigger and more attractive pedestrian-oriented area. Click through the links in their letter below to see much more. 

They write:

The Union Square Partnership is proud to announce the release of the Union Square-14th Street District Vision Plan: a bold new vision for transforming Union Square-14th Street into New York’s most accessible space.

The Wall Street Journal ran an exclusive today showcasing the Vision Plan, stating “…the plan’s ultimate goal is for parkgoers to know they have ‘arrived at a place that is special.'” Read the full article here.  

Building upon USP’s past investments, including the renovation of Union Square Park’s north end, City initiatives like Parks Without Borders, the 14th Street Busway, and the pedestrianization of Broadway, along with the more than one million square feet of new private development underway, our Vision Plan focuses on five key improvements prioritizing accessibility, district-wide connectivity, and substantial increases in public open space.

Designed in collaboration with Marvel, the Vision Plan is the culmination of a two-year-long engagement process working with community members, local business leaders, urban designers, transportation experts, and City and State agency partners. With over a thousand individuals engaged at twenty separate engagement events, it was the largest outreach effort in the Partnership’s 45-year history.

We are sure you will have questions and feedback about the Vision Plan and there will be many opportunities to learn more. The first is our official Vision Plan: Launch Event hosted in collaboration with the Urban Design Forum on Tuesday, January 26th at 12:00 PM. Please RSVP here.

Next, we will be hosting a series of Vision Plan: Community Conversations via Zoom to facilitate more robust discussions and gather feedback. Dates + times will be announced soon but you can express interest in attending a session here.

To familiarize yourselves with the plan, we have launched a dedicated web page with a robust amount of detailed information about the Union Square-14th Street District Vision Plan. Click on the link below to download and read the full report, our info sheet, and press release, as well as view the annotated renderings. There is also an FAQ, which hopefully will address most of your initial questions. You can explore more via unionsquarenyc.org/vision.

We look forward to fostering dialogue in the coming months that will guide our investments and set future priorities. It is my hope that as you review the Vision Plan that you will feel the impact of our collaborative community process and continue to share feedback as we move forward to the next stage.

Similar Posts

  • Union Square Is Hot for Retail

    According to a report from Crain’s New York:

     

    Foot traffic is stepping up in Union Square. The area now sees 11% more visitors on summer Fridays than it did in 2012, according to a recent survey conducted by the Union Square Partnership, the neighborhood’s business improvement district. After counting pedestrians and using data from subway turnstiles, the BID estimates that 383,000 people are in Union Square on a Greenmarket Friday.

    “Union Square has it all,” crowed Jennifer Falk, executive director of the BID, in a statement, referring to the park, transit options, shops and the Greenmarket.

    In recent months, the neighborhood has also drawn a variety of retailers—from Brooklyn doughnut shop Dough to classic outdoor-clothing brand Eddie Bauer. E-commerce brand Rent the Runway also set up a showroom in the area last fall. According to the BID, Union Square has a ground-floor retail vacancy rate of 2.9%, though several spaces are currently on the market.

    Retail rents in the area are pricey and rising. Dylan’s Candy Bar signed a deal for 3,300 square feet at 33 Union Square West, a spot formerly held by Puma, for $545 a square foot in the fall, for example. Such rents have pushed out several longtime retailers, including Union Square Café. The Danny Meyer-owned restaurant announced over the summer it will be vacating its space on East 16th Street after three decades. When Mr. Meyer opened the eatery in 1985, he reportedly paid around $50,000 a year in rent—that price has jumped to $650,000.

  • A Memo from The New School

    Here’s what’s happening in their building as described in a memo sent to the university community:

    June 22, 2009
    From President Bob Kerrey and Provost Tim Marshall Abatement of Hazardous Materials in the University Center at 65 5thAvenue This is a follow-up to the recent announcement of the closing of the 65Fifth Avenue. There were some questions from members of our communityand we thought it would be helpful to provide additional information. The closing occurred because our university’s trustees have approvedthe removal and abatement of hazardous materials in the building.Several Board members with considerable New York City constructionexperience recommended that abatement work be started in advance of thedecision to build since it is highly likely that decision will be madethis fall. Abatement of hazardous material will shorten the duration ofthe construction of the University Center project. However, becauseabatement results in stripping the interior of the building of allfinishes, it was necessary to close the building in order to performthis work. Please note that the abatement work would have beennecessary regardless of future building plans. The Board had previously authorized the production of schematicdrawings for a new building. This authorization has led to extensivecollaboration with the newly created University Facilities Committee.This committee is working closely with the architect, and severalsubcommittees have been formed to offer input around particular kinds ofspaces. This input will likely lead to a final Board decision in the fall toproceed with construction of the Fifth Avenue University Center. Thisdecision will depend upon evaluation of new construction cost estimates,of actual enrollment results, and of financing. We recognize that the closing of the 65th Fifth Avenue has resulted insignificant dislocation of student activities. We have accommodated someof these activities with new construction in Arnhold Hall on 13thStreet. However, more needs to be done. We are pursuing severalpromising real estate opportunities that give us confidence that we willbe able to provide the new amenities this year. In the unlikely event adecision is made not to proceed with the new construction, or to delayconstruction for a long period of time, the trustees will review alloptions for dealing with the existing building at 65 Fifth Avenue. We expect that a schedule of construction activities at the site can beannounced within a couple of weeks, when we expect the abatement anddemolition contracts approved by the trustees to be finalized. Afterworking with the University Facilities Committee to reach broadconsensus about the program for the new building, we will continue tomeet throughout the summer with the Committee and with other user groupsin developing the schematic design. We are also working to set upvenues for regular communication to the entire University communityabout the project’s progress.

  • The Latest Construction Update

    The New School says:

    Next week (August 29 to September 2), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers and line drilling will progress as well. Concrete foundation walls will continue along the perimeter of the site. Interior core foundation work and underground electrical and plumbing will proceed. Contractors will be removing the interior earth ramp. A small cherry picker crane will be delivered to the site next week and will be stationed inside the Construction fence. This crane will remain there for approximately two months.

    The following week (September 6 to September 9 ), we will continue with concrete foundation walls, line drilling, rock excavation, loading out, interior core foundation work, and underground electrical and plumbing. Concrete pours for the slab on grade are anticipated to start this week. The site will be closed for Labor Day weekend (Saturday, Sept. 3 through Monday, Sept. 5).

    DEP will continue to repair the water main along 13th Street. As part of this work, the DEP may periodically shut water service off. This work is out of our control.