Bookmark THIS LINK if you want to keep track of what the New School is saying about construction of its new building.
The new Hyatt Union Square at 13th and 4th is now open, as are all its restaurants.
You’ve surely noticed the water main repairs happening along 13th St. This will lead to water shutoffs at 830AM to perhaps 3PM on Thursday the 26th and Tuesday the 31st, and perhaps other times.
Next week (December 17 to December 21), material and equipment deliveries and installation work will continue on all floors inside the building.
The following week (December 24 to December 28), Material and equipment deliveries and installation work will continue on all floors. The site will be closed on December 25th for the holiday but will be open on Monday the 24th and Wednesday the 26th.
This weekend the site will be open on Saturday, December 15th for interior and superstructure related activities between the work hours of 7AM and 5PM as permitted by the City.
In case you missed it on Friday, protesters invaded and occupied the New School buidling on our block for about 6 hours on Friday morning. Unlike the previous demonstration in December, this one was summarily shut down by a powerful NYPD push at the request of the university, and around 20 occupiers, some of whom appear to have been troublemakers as opposed to students, were arrested. The real losers in all this were the businesses on our block, who were prevented from opening until Friday afternoon.
Expanded pedestrian space and more cycling lanes are central to a planned redesign of Manhattan’s Broadway between E. 17th and E. 21st streets, city officials announced on Monday.
The changes are subject to public outreach — but Department of Transportation officials said they could mimic a change to other areas of Broadway between Union Square and E. 50th Street, where crews in recent years have added more pedestrian plazas, outdoor dining space and wider crosswalks designed to keep pedestrians safe from crashes.
DOT officials also said they’re considering adding a two-way bike lane between E. 17th and E. 21st streets, which already has a one-way southbound lane for cyclists.
The city earlier this year completed an overhaul of Broadway between E. 25th and E. 32nd streets, adding more space for pedestrians, another two-way bike lane and other infrastructure designed to make motorists drive slower.
“This next phase of Broadway Vision will provide the same kind of vibrant public spaces connecting Union Square and Flatiron, just like our administration is doing with incredible success across the entire city,” Mayor Eric Adams said in a statement.
The latest planned improvements are just north of Union Square — and just south of where a taxi driver jumped a sidewalk last year, sending several pedestrians to the hospital.
From The New School:
Next week (September 19 to September 23), Contractors will continue to excavate earth and rock, and load out material. Installation of bracing rakers and line drilling will progress as well. Concrete foundation walls around the perimeter of the site and slab on grade work will continue. Interior core foundation work and underground electrical and plumbing will proceed. Contractors will be removing the interior earth ramp. DOT approved street connections to underground utilities on Fifth Avenue will progress. A small cherry picker crane will arrive on site next week, and be stationed inside the Fifth Avenue fence. This crane will remain on site for approximately two months.
The following week (September 26 to September 30 ), we will continue with concrete foundation walls and slabs, line drilling, rock excavation, loading out, interior core foundation work, street utility connections on Fifth Avenue, and underground electrical and plumbing.
DEP continues to repair the water main along 13th Street. As part of this work, the DEP may periodically shut water service off. This work is out of our control.
The site will be open on Saturday, September 17th. Work hours are between 9AM and 5PM as permitted by the City. To control noise levels, work activities will be limited to the placement of formwork, plumbing and electrical work, site utility connections, waterproofing and rebar for concrete placement, and the installation of walers and braces. There will be no rock excavation, rock chopping, or hauling on Saturday.