University and 13th: 1935

The northeast corner of University and 13th St., looking east, circa 1935. That’s the corner with the Basics hardware store. Fascinating!

Similar Posts

  • New 14th St. Tech Hub Will Include a Food Hall

     

    from 6sqft:

    Pioneering food hall operator Urbanspace is opening its latest outpost at Union Square reports the NY Post. They’ve leased 10,000 square feet at Zero Irving, the contested tech hub on 14th Street that will serve as office space, a technology training center and incubator, co-working spaces, and an event space when it opens in the first half of 2021.

    Located at 124 East 14th Street, at the former site of the P.C. Richard & Son building, Zero Irving has faced opposition for years, as local preservationists and community groups felt that the rezoning required for the development should have included protections for the surrounding neighborhood, which is largely low-rise and residential.

    Nevertheless, the $200 million project has been under construction for the past year. Despite the thousands of small business closings around the city, UrbanSpace founder and president Eldon Scott is confident in what will be his company’s fifth food hall in New York City. “We have the ideal business model to help the New York culinary world recover,” he told the Post.

    UrbanSpace’s other locations are Urbanspace Vanderbilt near Grand Central (the first location, which opened in 2015), Lexington Avenue and 51st Street, 135 West 50th Street, and 152 West 52nd Street. They’re also behind the holiday markets in Grand Central, Union Square, Columbus Circle, and Bryant Park, as well as seasonal food market pop-ups like those at Madison Square and the Garment District.

  • Latest New School Construction Update

    Next week (August 20 to August 24), Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation on upper floors will continue and lower levels will continue on 13th st. with the aid of a small crane. The crane will remain on 13th st. for the purpose of curtain wall installation.

    The following week (August 27 to August 31) Material and equipment deliveries and installation work will continue on all floors. Curtain wall installation will continue on all floors. Work on 13th st should be complete by the end of this week and will be moved to 5th ave. to continue wrapping the building.

    This weekend the site will be open on Saturday, August 25th for superstructure related activities and curtain wall installation between the work hours of 7AM and 5PM as permitted by the City. The crane on 13th st. will not be used during the weekend. Con Ed is on site working on the building but is not in any of the streets.

    Additionally over the holiday weekend the site will be open on Saturday, September 1st but will be closed on Monday, the 3rd.