Welcome…Again

It’s been a while, but our site is up and running again, and we hope to make it fun and informative.

Similar Posts

  • Italian Pastry on the Way

    Opening on May 21 at Broadway and 18th St., Minuto Bauli is the first U.S. outpost of the beloved Verona-based baking dynasty, Bauli. But this isn’t your average bakery. It’s a one-product wonderland dedicated entirely to a single, freshly baked, filled-to-order Italian treat: the Minuto Bauli.

    What is a Minuto Bauli, exactly? Think of it as the pastry equivalent of a mic drop. The dough, made with Bauli’s century-old Futura mother yeast, is crafted in Italy using high-quality ingredients like flour, eggs, butter and milk, then shipped to New York City, where it rises for 12 hours before being baked and dressed up right before your eyes. Guests can customize their treat with a selection of lush Italian creams, preserves, spreads and gourmet toppings.

  • Latest New School Construction Update

    DOB has granted our request to start placing our concrete at 6am, which will allow us to finish this work earlier in the evening. We have 3 more instances like this until we finish our superstructure in early June. Friday, May 4 we will have a pour at the 16th floor with a 6am start time and similar end dime, weather permitting.

    Therefore, next week (May 7 to May 11), Superstructure work will continue at the 17th floor level. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    The following week (May 14 to May 18), we will continue superstructure concrete and slabs on the 17th floor and roof levels. Deliveries for the internal systems of the building have been ongoing and will continue, although they should not greatly affect the flow of pedestrian and road traffic.

    This weekend the site will be open on Saturday, May 5th for superstructure related activities between the work hours of 7AM and 5PM as permitted by the City. To control noise levels within the site, work activities will be limited to the placement of formwork and concrete, plumbing and electrical work, rebar for concrete placement, using the crane and equipment to support all activities. Safety horns are used, and required by law, to coordinate lifting with the crane and to alert the workers of the danger overhead. We have directed the operators to limit the use of horns to one short sounding and to use the crane later in the day so as to avoid any excess noise. In addition to the normal work on the job site, we will have an additional crane on site at 5th ave. to install the stair trusses on the west side of the building. The crane will be completely on site and should not interfere with pedestrian or automotive traffic in the area.

  • A Bit More About 12 East 13th St.

    From the NY TIMES:

    As bikes abound and roads grow narrower, New York can seem to be turning its back on cars. The rapid disappearance of gas stations may not be helping things either.

    Parking garages are befalling similar fates, which may not be that surprising: Often humdrum, and built for function, they rarely seem to be the focus of preservation efforts, and developers have long eyed their sites for their potential.

    But in Greenwich Village, two garages are being incorporated into condo developments, at 12 East 13th Street, with eight units, and 17 East 12th Street, with nine.

    On East 13th, near Fifth Avenue, DHA Capital and Continental Properties are at work on a garage once used mainly by Hertz, the rental car company, which also had a ground-floor office. With eight floors, the garage was built in 1930, before modern zoning laws were imposed on the low-slung area, limiting height.

    Indeed, had the developers torn down the garage and built new, it is doubtful that a new structure could have been as bulky as what is there now, which meant converting was a better option, said Dan Hollander, DHA’s managing principal.

    Still, the developers could shift some things around; by shaving off the back of the building and adding that mass to the top, they were able to boost the height to 12 stories.

    Other alternations are needed. The windows were not big enough for residential use, so they are being enlarged, as the building also gains a new facade, Mr. Hollander said. But starting with a foundation and walls cut some construction costs on the $75 million project, he added; similarly, the condo will take less time to complete, about 16 months, versus 24 months for ground-up construction.

    DHA is also keeping a parking area, but for 11 cars, not 100 as before, and just on the second floor. Residents will drive into the original bay, then a robotic lift will pick up the vehicle and stow it.

    Starting at $7.5 million for a three-bedroom, the units went on sale in April, although no contracts had been signed by late June.

    An almost identical game plan is being followed on East 12th Street, where Rigby Asset Management is removing walls and floors from the back of the eight-story building to allow it to grow to 11 stories, giving apartments more light and air. There, too, a floor will be kept for parking, on the ground floor, for nine cars; and the same automated apparatus as at East 13th Street will serve as attendant. The nine condos, most of which have four bedrooms, are much pricier, however, starting at $14 million. Sales began at the end of June.

    “You get column-free space and tall ceilings,” said Peter Armstrong, Rigby’s managing partner, who previously converted a garage at 73 Wooster Street into a six-unit condo. “You feel like an artist with a blank canvas.”